Project type

Kitchen remodel

Cost

$38,000

Location

S Broadway, Walnut Creek

Duration

6 weeks

Condo kitchen remodel on S Broadway, Walnut Creek

For this kitchen remodel, our challenge was to maximize the storage space. To do this, we installed 32" deep pull out drawers inside the floor to ceiling cabinets and installed cabinets along the entire front wall of the kitchen. As for lighting, we installed under cabinet lights and added 6 new recessed lights into the room. For finishes, we used a butcher block countertop, a 2 dimensional subway tile with white grout, and inset appliances to keep everything neat. The paint on the accent wall was from the creative genius of our client.